Vehicle set-up
1. Park the vehicle on a level surface and apply the parking brake.
2. Start the engine and let it idle until it reaches operating temperature.
3. Turn the engine off and wait more than 10 minutes.
4. Raise and support the vehicle using a suitable floor jack and safety jack stands.
- Place the safety jack stands under the vehicle jack-up points.
- A suitable adapter should be attached to the jack stand saddle.

Make sure the correct lifting and support points are used to avoid vehicle damage.
See also:
Exterior design
First revealed as the Qazana show car - unveiled at the 2009 Geneva Motor
Show - Juke was created at the London-based Nissan Design Europe and refined at
Nissan's Design Centre (NDC) in Japan. Qas ...
Instrument panel storage (if so equipped)
Instrument panel storage (if so equipped)
To open the storage bin, push and release. The
storage tray will automatically move to the open
position.
● The inside of the storage bin can ge ...
Inside the vehicle
The maintenance items listed here should be
checked on a regular basis, such as when performing
periodic maintenance, cleaning the vehicle,
etc.
Additional information on the following
items ...
