Installing covers to rear parcel shelf

CAUTION

CAUTION

Make sure that the hinge is completely aligned with the pin. If the pin is forced into position, it may break.

Install the top tether anchor cover or key cylinder cover as follows:

1. With the pin on one end kept free of its hinge 1 , align the pin of the other end and slide it into the hinge 2 .

2. With the first pin in position 2 , align the

2. With the first pin in position 2 , align the second pin with its hinge slot 1 and push down on the cover to completely engage it. A snap sound will be heard.

3. Close the cover.

3. Close the cover.

    See also:

    Tongue load
    Keep the tongue load between 10 - 15 percent of the total trailer load or use the trailer tongue load specified by the trailer manufacturer. The tongue load must be within the maximum tongue load ...

    Improved 2.5 four-cylinder dCi
    The existing 2.5 dCi four cylinder engine hasn't been forgotten, however, and significant improvements will cement its position as the most popular engine in the range with improvements to both ov ...

    Securing the load
    There are tie down hooks located in the cargo area as shown. The tie down hooks can be used to secure cargo with ropes or other types of straps. Do not apply a total load of more than 22 lb ...