Installing covers to rear parcel shelf

CAUTION
Make sure that the hinge is completely aligned with the pin. If the pin is forced into position, it may break.
Install the top tether anchor cover or key cylinder cover as follows:
1. With the pin on one end kept free of its hinge 1 , align the pin of the other end and slide it into the hinge 2 .

2. With the first pin in position 2 , align the second pin with its hinge slot 1 and push down on the cover to completely engage it. A snap sound will be heard.

3. Close the cover.
See also:
Tongue load
Keep the tongue load between 10 - 15 percent of
the total trailer load or use the trailer tongue load
specified by the trailer manufacturer. The tongue
load must be within the maximum tongue load ...
Improved 2.5 four-cylinder dCi
The existing 2.5 dCi four cylinder engine hasn't been forgotten, however, and
significant improvements will cement its position as the most popular engine in
the range with improvements to both ov ...
Securing the load
There are tie down hooks located in the cargo
area as shown. The tie down hooks can be used
to secure cargo with ropes or other types of
straps.
Do not apply a total load of more than 22
lb ...
